Bad day for Mr Potato Head!

Post by mick » Wed Nov 27, 2013 11:22 pm

This potato lorry didn't make the corner. It was fully laden and was laying peacefully on the verge when we arrived :P

The job was attended with the NRC. The load was released/removed and the crane rigged to provide both the righting effort and a catch line for a controlled roll. There were lots of potatoes to move and, as is often the case, the load takes longer to deal with than the actual recovery.

Image
Image
Image
Image
Image
Image
Image
Image
]Image
Image
Image Image Image Image Image Image Image Image Image Image Image Image Image

cliffy
New User
Posts:51
Joined:Fri Nov 07, 2008 8:16 pm

Re: Bad day for Mr Potato Head!

Post by cliffy » Fri Jan 10, 2014 10:03 pm

oooooops,looks like he has had his chips :lol: